av Mirachl | jun 2, 2017 | Blog
After a few weeks of intense field work at site Färgaren and site Hagfors with the purpose of getting a proper baseline data set before the PCE remediation works start at both sites, some large geophysical data sets and a large number of water samples has been...
av Mirachl | maj 12, 2017 | Blog
Since two weeks ago, the contractor Veolia is installing the remediation equipment at site Färgaren, Kristianstad. More than one hundred thermal elements are to be installed to a depth of approximately 20 m. Before each thermal element is installed a casing of metal...
av Mirachl | apr 26, 2017 | Blog
The DCIP measurements at the Hagfors site are continuing their second week and so far the weather has been very varied, experiencing both sunburn and snow storm. The schedule is to measure one line each day since the terrain is tough and it takes time to aquire data...
av Mirachl | apr 4, 2017 | Blog
MIRACHL was represented both on stage and in the poster session as well as in the Tyréns booth, where the visitors could leave the real world for a moment and enter another reality – the virtual reality (VR). In the booth the guests could trot around down in the...
av Mirachl | mar 26, 2017 | Blog
The strategy of the MIRACHL project is to develop geophysical technique and methodology for monitoring in situ remediation of PCA contaminated sites in as close cooperation as possible in ongoing projects. Preliminary three main field sites are used –...
av Mirachl | mar 21, 2017 | Blog
After the geophysical DCIP baseline measurements were successfully carried out at site Färgaren at the beginning of March, last week also the biogeochemical and isotope sampling has now been successfully completed. PhD student Sofia Åkesson and PhD David Hagerberg...