During October, it has been full activity at the Alingsås site. Base line measurements with DCIP has been carried out, as well as groundwater sampling (both PBGC and CSIA). After that, a DCIP-monitoring system has been digged down in the ground together with installation of new wells with DCIP-borehole equipment and sensors in other wells. All this because a test in situ remediation with injection of two different products will start in early November. We are curious to see the first results!